Bathroom Remodeling in Miami, FL

We rebuild bathrooms from the studs out — waterproofing, tile, plumbing fixtures, vanities and lighting — with a written scope and a fixed price before demo day. We work throughout Miami and the rest of Miami-Dade County.

Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.

Licensed & Insured

2-Year Workmanship Warranty

10-Year Structural Warranty

Free Estimate in 24 Hours

What to know about bathroom remodeling in Miami

Miami permits run through the City of Miami Building Department, and older Little Havana and Shenandoah homes often need plumbing and panel updates as part of a remodel.

Miami housing is mostly 1940s–1970s single-family homes, mid-rise condos and newer infill construction, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.

Included in every Miami project

  • Demo and haul-away of existing fixtures, tile and drywall
  • Plumbing rough-in and fixture relocation where needed
  • Full shower waterproofing before any tile goes down
  • Porcelain, ceramic or natural stone tile installation
  • Vanity, counter, mirror, lighting and exhaust fan
  • Glass shower enclosures and frameless doors
  • Permits, inspections and final punch list

Bathroom Remodeling costs in Miami

Guest / hall bath refresh

Tub-shower retile, vanity, fixtures, paint.

$9,000 – $16,000

Full guest bath rebuild

Gut to studs, new layout-friendly plumbing, tile floor to ceiling.

$16,000 – $28,000

Primary bath / walk-in shower

Larger footprint, frameless glass, double vanity, stone.

$25,000 – $55,000+

Ranges reflect typical Miami-Dade County projects. Your written estimate is specific to your home.

Our process

  1. 1

    Walkthrough & measurements

    We look at the space, talk through what you want, and take real measurements.

  2. 2

    Written itemized estimate

    Line items and dollar allowances so you know exactly what your price covers.

  3. 3

    Selections & permits

    We help you pick materials that fit the allowance, then pull permits.

  4. 4

    Build

    Demo, rough-in, inspection, waterproofing, tile, finishes.

  5. 5

    Punch list & warranty

    We walk it with you, fix anything on the list, and hand over the warranty.

Recent work

Bathroom Remodeling project completed by DSC Service & Solutions 1Bathroom Remodeling project completed by DSC Service & Solutions 2Bathroom Remodeling project completed by DSC Service & Solutions 3Bathroom Remodeling project completed by DSC Service & Solutions 4Bathroom Remodeling project completed by DSC Service & Solutions 5Bathroom Remodeling project completed by DSC Service & Solutions 6Bathroom Remodeling project completed by DSC Service & Solutions 7Bathroom Remodeling project completed by DSC Service & Solutions 8

Common questions

How long does a bathroom remodel take?

Most single bathrooms run 3–5 weeks from demo to punch list, depending on inspections and material lead times. We give you a start date and an estimated finish date in writing.

Do I need a permit?

If plumbing, electrical or framing changes, yes. We pull the permit and handle inspections. Cosmetic swaps like a vanity replacement usually don't require one.

Can I use my own tile and fixtures?

Absolutely. We'll list a material allowance in the estimate and credit it if you supply your own.

Will I have a usable bathroom during the work?

If it's your only bathroom, we sequence the work to minimize downtime and tell you upfront which days it'll be out of service.

Free bathroom remodeling estimate in Miami

One message is all it takes. We'll book your on-site estimate — usually within 24 hours.