A plain-English breakdown of what requires a permit in Miami-Dade, Broward, Palm Beach and St. Lucie County — and what doesn't.
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
Rules vary by city. We confirm with the local building department before work starts.
Permits are issued by the individual municipality, or by Miami-Dade County for unincorporated areas. Some cities add design or historic review on top.
Each city runs its own building department under the Florida Building Code, with Broward County oversight. HOA approval is common on exterior work.
City or county depending on address. Historic districts in Delray Beach and West Palm Beach have additional review for exterior changes.
Port St. Lucie permits through the city building department; unincorporated addresses go through St. Lucie County. Most subdivisions also require HOA approval on exterior work.
A licensed contractor should pull it under their license. Be cautious if a contractor asks you to pull an owner-builder permit for work they're performing; that shifts liability to you.
Simple trade permits are often days; permits requiring plan review can take several weeks depending on the city. We factor the local timeline into your schedule.
Unpermitted work can surface during inspection or at resale. It can usually be permitted after the fact, sometimes with opening of walls for inspection. We'll tell you what's realistic.
No. Association approval and a city building permit are separate requirements, and condos typically need both.
Tell us what you're planning and we'll tell you exactly what it needs — free estimate in 24 hours.