Walk-In Showers & Tub-to-Shower Conversions in South Florida

Most people stop using the tub years before they replace it. We take the tub out, rebuild the space as a low-step or curbless walk-in shower, waterproof it properly before any tile goes down, and finish it with the glass and fixtures you pick.

Free itemized estimate within 24 hours.

Licensed & Insured

2-Year Workmanship Warranty

10-Year Structural Warranty

Free Estimate in 24 Hours

What's included

  • Tub removal and haul-away
  • Plumbing relocated for a shower valve and drain
  • Full waterproofing membrane before any tile
  • Low-step, low-threshold or fully curbless entry
  • Porcelain, ceramic or natural stone tile and niches
  • Frameless or semi-frameless glass enclosure
  • Grab bars, benches and handheld sprayers where you want them
  • Permits, inspection and final punch list

How the project runs

  1. 1

    Walkthrough & measurements

    We look at the tub, the wall behind it and where the drain sits, then talk through step height.

  2. 2

    Written itemized estimate

    Line items and dollar allowances for tile, glass and fixtures so nothing is hidden.

  3. 3

    Selections & permit

    You pick tile, glass and hardware. We pull the permit.

  4. 4

    Build

    Tub out, plumbing moved, waterproofing, inspection, tile, glass.

  5. 5

    Punch list & warranty

    We run the water with you, check every joint, and hand over the warranty.

What walk-in shower conversions typically run in South Florida

Real ranges, not teaser pricing. Your written estimate will be specific to your home.

Straight tub-to-shower swap

Same footprint, same drain location, standard tile.

$7,500 – $13,000

Walk-in shower with frameless glass

Larger opening, niche, bench, frameless enclosure.

$12,000 – $22,000

Curbless / roll-in shower

Floor re-sloped, linear drain, wider door opening.

$18,000 – $35,000+

Read our free guide on comparing contractor estimates →

Recent work

Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 1Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 2Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 3Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 4Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 5Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 6Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 7Walk-In Showers & Tub-to-Shower Conversions project by DSC Service & Solutions 8

Common questions

How long does a tub-to-shower conversion take?

Most run 2–3 weeks from demo to punch list. Waterproofing and inspection have to happen before tile, and that sequence is not one we rush.

Can you make it step-free for a walker or wheelchair?

Yes. A curbless roll-in shower needs the floor re-sloped and usually a linear drain, and we will tell you on the walkthrough whether your slab allows it.

Do I need a permit to remove a tub?

If the plumbing moves, yes. We pull the permit and handle the inspection. We will tell you which category your job falls into before you commit.

Will I lose resale value taking out my only tub?

If it is the only tub in the house we will say so plainly, so you can decide with your eyes open. In a two-bath home it almost never hurts.

Can you add grab bars and a bench?

Yes, and we block the wall behind the tile for them so they hold properly instead of being screwed into drywall later.

Walk-In Showers & Tub-to-Shower Conversions by city

We serve Miami-Dade, Broward, Palm Beach and St. Lucie County.

Ready for a real walk-in shower work number?

Send one message. We'll book your free on-site estimate — usually within 24 hours.