Most people stop using the tub years before they replace it. We take the tub out, rebuild the space as a low-step or curbless walk-in shower, waterproof it properly before any tile goes down, and finish it with the glass and fixtures you pick. We work throughout Lighthouse Point and the rest of Broward County.
Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
Lighthouse Point is a small waterfront city with its own building department, and canal-front work can trigger extra review before a permit is issued.
Lighthouse Point housing is mostly 1950s–1970s waterfront ranch homes on canal lots, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.
Straight tub-to-shower swap
Same footprint, same drain location, standard tile.
$7,500 – $13,000
Walk-in shower with frameless glass
Larger opening, niche, bench, frameless enclosure.
$12,000 – $22,000
Curbless / roll-in shower
Floor re-sloped, linear drain, wider door opening.
$18,000 – $35,000+
Ranges reflect typical Broward County projects. Your written estimate is specific to your home.
We look at the tub, the wall behind it and where the drain sits, then talk through step height.
Line items and dollar allowances for tile, glass and fixtures so nothing is hidden.
You pick tile, glass and hardware. We pull the permit.
Tub out, plumbing moved, waterproofing, inspection, tile, glass.
We run the water with you, check every joint, and hand over the warranty.








Most run 2–3 weeks from demo to punch list. Waterproofing and inspection have to happen before tile, and that sequence is not one we rush.
Yes. A curbless roll-in shower needs the floor re-sloped and usually a linear drain, and we will tell you on the walkthrough whether your slab allows it.
If the plumbing moves, yes. We pull the permit and handle the inspection. We will tell you which category your job falls into before you commit.
If it is the only tub in the house we will say so plainly, so you can decide with your eyes open. In a two-bath home it almost never hurts.
Yes, and we block the wall behind the tile for them so they hold properly instead of being screwed into drywall later.
One message is all it takes. We'll book your on-site estimate — usually within 24 hours.