Whole-Home Remodeling in Miramar, FL
One contract, one schedule, one point of contact for kitchens, baths, floors, paint, electrical and carpentry — instead of coordinating five separate trades yourself. We work throughout Miramar and the rest of Broward County.
Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.
Get your free quote. Pick the easiest way:
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
What to know about whole-home remodeling in Miramar
Miramar splits between an older eastern half and newer western communities, and most of the western subdivisions require HOA sign-off before exterior or driveway work begins.
Miramar housing is mostly 1950s–1970s homes in east Miramar and 1990s–2010s single-family homes in the west, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.
Included in every Miramar project
- •Full scope development and written itemized estimate
- •Permits, drawings coordination and inspections
- •Kitchen and bathroom renovation
- •Flooring throughout
- •Electrical, lighting and plumbing updates
- •Interior and exterior painting
- •Carpentry, doors and trim
- •Final clean and punch list
Whole-Home Remodeling costs in Miramar
Cosmetic refresh (2 bed / 2 bath)
Floors, paint, fixtures, light kitchen and bath work.
$35,000 – $70,000
Full interior renovation
Kitchen, baths, floors, electrical, carpentry.
$80,000 – $180,000
Gut renovation
Walls moved, systems replaced, permitted structural work.
$180,000+
Ranges reflect typical Broward County projects. Your written estimate is specific to your home.
Our process
- 1
Full-home walkthrough
Room by room, we write down every item in scope.
- 2
Itemized estimate & schedule
Phased so you can see what happens when — and what it costs.
- 3
Permits & selections
We handle the paperwork and help you finalize materials.
- 4
Build in phases
Sequenced to keep as much of the home livable as possible.
- 5
Final walkthrough & warranty
One punch list, one warranty, one company responsible.
Recent work








Common questions
Can we live in the house during the work?
Sometimes. We'll tell you honestly during the walkthrough whether phasing makes it realistic for your project.
Do you provide drawings?
For permitted structural work we coordinate with an architect or engineer as required by the city.
How are payments structured?
A deposit, then draws tied to completed milestones, with the final payment after your punch list is finished.
Who manages the subs?
We do. You have one point of contact for the entire project.
Free whole-home remodeling estimate in Miramar
One message is all it takes. We'll book your on-site estimate — usually within 24 hours.
