Whole-Home Remodeling in Stuart, FL
One contract, one schedule, one point of contact for kitchens, baths, floors, paint, electrical and carpentry — instead of coordinating five separate trades yourself. We work throughout Stuart and the rest of Martin County.
Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.
Get your free quote. Pick the easiest way:
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
What to know about whole-home remodeling in Stuart
Stuart permits through the city while addresses just outside the line go through Martin County, and the historic downtown district adds design review for anything visible from the street.
Stuart housing is mostly 1920s–1950s cottages downtown, mid-century ranches and waterfront homes along the St. Lucie River, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.
Included in every Stuart project
- •Full scope development and written itemized estimate
- •Permits, drawings coordination and inspections
- •Kitchen and bathroom renovation
- •Flooring throughout
- •Electrical, lighting and plumbing updates
- •Interior and exterior painting
- •Carpentry, doors and trim
- •Final clean and punch list
Whole-Home Remodeling costs in Stuart
Cosmetic refresh (2 bed / 2 bath)
Floors, paint, fixtures, light kitchen and bath work.
$35,000 – $70,000
Full interior renovation
Kitchen, baths, floors, electrical, carpentry.
$80,000 – $180,000
Gut renovation
Walls moved, systems replaced, permitted structural work.
$180,000+
Ranges reflect typical Martin County projects. Your written estimate is specific to your home.
Our process
- 1
Full-home walkthrough
Room by room, we write down every item in scope.
- 2
Itemized estimate & schedule
Phased so you can see what happens when — and what it costs.
- 3
Permits & selections
We handle the paperwork and help you finalize materials.
- 4
Build in phases
Sequenced to keep as much of the home livable as possible.
- 5
Final walkthrough & warranty
One punch list, one warranty, one company responsible.
Recent work








Common questions
Can we live in the house during the work?
Sometimes. We'll tell you honestly during the walkthrough whether phasing makes it realistic for your project.
Do you provide drawings?
For permitted structural work we coordinate with an architect or engineer as required by the city.
How are payments structured?
A deposit, then draws tied to completed milestones, with the final payment after your punch list is finished.
Who manages the subs?
We do. You have one point of contact for the entire project.
Free whole-home remodeling estimate in Stuart
One message is all it takes. We'll book your on-site estimate — usually within 24 hours.
