Kitchen Remodeling in North Palm Beach, FL
From cabinet refacing to a full gut with a new layout, we handle cabinets, counters, tile, lighting, plumbing and appliance hookups under one contract. We work throughout North Palm Beach and the rest of Palm Beach County.
Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.
Get your free quote. Pick the easiest way:
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
What to know about kitchen remodeling in North Palm Beach
North Palm Beach permits through the village, and plenty of the original 1950s homes here still run on their first electrical panel and cast-iron drain lines.
North Palm Beach housing is mostly 1950s–1970s ranch homes, waterfront properties and low-rise condos, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.
Included in every North Palm Beach project
- •Demo and disposal of existing cabinets and counters
- •Cabinet supply and installation, or refacing
- •Quartz, granite or butcher-block countertop templating and install
- •Backsplash tile and under-cabinet lighting
- •Sink, faucet, disposal and dishwasher hookups
- •Electrical outlets, circuits and recessed lighting
- •Flooring, trim, paint and appliance set
Kitchen Remodeling costs in North Palm Beach
Cabinet reface + new counters
Same layout, new doors, quartz, backsplash.
$12,000 – $22,000
Full replacement, same layout
New cabinets, counters, tile, lighting, appliances set.
$25,000 – $45,000
Gut with layout change
Moving plumbing/electrical, walls, island, custom millwork.
$45,000 – $90,000+
Ranges reflect typical Palm Beach County projects. Your written estimate is specific to your home.
Our process
- 1
Layout review
We measure and talk through what's not working about the current kitchen.
- 2
Written itemized estimate
Cabinets, counters, labor and allowances broken out separately.
- 3
Order & lead times
Cabinets and stone get ordered early so the crew isn't waiting.
- 4
Build
Demo, rough-in, cabinets, template, counters, backsplash, finishes.
- 5
Punch list & warranty
Doors and drawers adjusted, silicone lines clean, everything tested.
Recent work








Common questions
How long will my kitchen be out of use?
Typically 4–8 weeks total, with roughly 2–3 of those weeks between cabinet install and countertop install. We help you set up a temporary kitchen.
Custom or stock cabinets?
Both. Stock and semi-custom keep costs down; custom makes sense for odd layouts, tall ceilings or specific finishes. We price the options side by side.
Do you move gas or plumbing lines?
Yes, with licensed trades and permits when the layout changes.
Can you work around my appliances?
Yes — we can reuse existing appliances or coordinate the install of new ones.
Free kitchen remodeling estimate in North Palm Beach
One message is all it takes. We'll book your on-site estimate — usually within 24 hours.
