Kitchen Remodeling in Palm City, FL
From cabinet refacing to a full gut with a new layout, we handle cabinets, counters, tile, lighting, plumbing and appliance hookups under one contract. We work throughout Palm City and the rest of Martin County.
Free itemized estimate within 24 hours — text, WhatsApp or call (772) 353-0575.
Get your free quote. Pick the easiest way:
Licensed & Insured
2-Year Workmanship Warranty
10-Year Structural Warranty
Free Estimate in 24 Hours
What to know about kitchen remodeling in Palm City
Palm City is unincorporated Martin County, so every permit runs through the county, and river and canal-front lots here carry flood-elevation requirements that need settling before the design is final.
Palm City housing is mostly 1980s–2010s single-family homes on large lots plus riverfront properties, which shapes what a realistic scope and budget look like here. We factor that into the estimate instead of handing you a generic square-foot number.
Included in every Palm City project
- •Demo and disposal of existing cabinets and counters
- •Cabinet supply and installation, or refacing
- •Quartz, granite or butcher-block countertop templating and install
- •Backsplash tile and under-cabinet lighting
- •Sink, faucet, disposal and dishwasher hookups
- •Electrical outlets, circuits and recessed lighting
- •Flooring, trim, paint and appliance set
Kitchen Remodeling costs in Palm City
Cabinet reface + new counters
Same layout, new doors, quartz, backsplash.
$12,000 – $22,000
Full replacement, same layout
New cabinets, counters, tile, lighting, appliances set.
$25,000 – $45,000
Gut with layout change
Moving plumbing/electrical, walls, island, custom millwork.
$45,000 – $90,000+
Ranges reflect typical Martin County projects. Your written estimate is specific to your home.
Our process
- 1
Layout review
We measure and talk through what's not working about the current kitchen.
- 2
Written itemized estimate
Cabinets, counters, labor and allowances broken out separately.
- 3
Order & lead times
Cabinets and stone get ordered early so the crew isn't waiting.
- 4
Build
Demo, rough-in, cabinets, template, counters, backsplash, finishes.
- 5
Punch list & warranty
Doors and drawers adjusted, silicone lines clean, everything tested.
Recent work








Common questions
How long will my kitchen be out of use?
Typically 4–8 weeks total, with roughly 2–3 of those weeks between cabinet install and countertop install. We help you set up a temporary kitchen.
Custom or stock cabinets?
Both. Stock and semi-custom keep costs down; custom makes sense for odd layouts, tall ceilings or specific finishes. We price the options side by side.
Do you move gas or plumbing lines?
Yes, with licensed trades and permits when the layout changes.
Can you work around my appliances?
Yes — we can reuse existing appliances or coordinate the install of new ones.
Free kitchen remodeling estimate in Palm City
One message is all it takes. We'll book your on-site estimate — usually within 24 hours.
